50T All-electric eLARS system for offshore support vessel

0581 Elars Symphony Web
11645 Macartney Esbjerg Havn 006 Edit
From SAT IMG 20230412 075533 Edit
11645 Macartney Esbjerg Havn 045 Edit

Challenge

Client objective: An innovative launch and recovery solution supporting the wish for an electrically driven solution in a modern installation fleet. 

Task

  • Non-hydraulic driven system
  • Innovative, advanced technology
  • Operational reliability
  • Low maintenance
  • Support client commitment in transition to electrical solutions
  • Meet the large-scale launch and recovery requirements for a visionary trencher

Scope of Supply

The customised supplied eLARS™ system includes

  • eA-Frame
  • Docking Head
  • Winch

The leg height of the eA-Frame is 14 metres, with an 11-metre distance between them.

The 500 kN A-frame has a safe working load of 50 tonnes and advanced PLC technology, allowing complete remote system control.

Result

  • Lower maintenance costs via reduced spare parts requirements
  • No need for regular hose changes and filter replacements
  • Fully electrical solution 
  • Compact design optimises deck space utilisation
  • Efficient installation and operation
  • Intelligent self-assessment capability for preventive maintenance
  • High level of redundancy, ensuring continuous functionality
  • Next-level integrated and remote control system