Active heave compensated platform for geotechnical drilling

case47_DSC_0631.png

Scope of supply

  • Turnkey solution
  • 100 t AHC platform
  • Integrated control system
  • Synchronised with vessel DP control system
  • 7 active heave compensating winches
  • Project management
  • Mechanical design and engineering
  • Installation and commissioning